SeattleHomework Sign in
Seattle, WA 98117 · 9th Ave NW · Crown Hill Add

9228 9th Ave NW

Built 1938 · 980 sq ft
Manage Home
LOT 8,053 SQ FT · 3 STRUCTURES · APN 186240-0280Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1938
Living area
980 sqft
Lot size
8,053 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1.5
Home type
Single-family
Parcel (APN)
186240-0280
Last sold
$645,000
County value
$829,000

Major systems

Heating
Electric baseboard (electric)
Stories
1

See something wrong above? Report an error

Nearby on this street

See all 275 homes on 9th Ave NW →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2025
    permit on fileRoom addition — Allow New Attached Accessory Dwelling Unit To Existing Single Family Use Per Land Use Code. Construct Substantial Alterations For A Two Family Dwelling Per Plan.
  • 2022
    permit on fileHeating & cooling — Hello, I'M Running 50Ft 3/4In Pvc Conduit Under My Deck From The Main Panel For A Heat Pump Shutoff And Maintenance Receptacle. There Are (2) 12Guage Circuits, One For The 15Amp 2 Pole Gfci Breaker And Another For The 20Amp Breaker With Gfci Receptacle. Thank You, Ben
  • 2021
    permit on fileElectrical — 200 Amp Service · QUEEN ANNE ELECTRIC LLC
  • 2007
    permit on fileGeneral remodel — Alterations To Repair Fire Damage To Interior Of Existing Single Family Residence Subject To Field Inspection
  • 2007
    permit on fileElectrical — Remodel Wiring · HILL ELECTRIC CORPORATION
  • 2006
    permit on fileElectrical — Reloction Of Electric Meter To Code Compliant Location (As Per Seattle City Light) And Installation Of A New Electric Panel Aproximately 7" To The Right Of Existing Location. This Work Will Consist Of New Wire In 2" Pvc Conduit From New Weather-Head To New Meter And New Wire In 1.5" Pvc Conduit From

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACOn record
Permit on file · 2022
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2021
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.