SeattleHomework Sign in
Seattle, WA 98117 · NW 65th St · Ballard Add The

857 NW 65th St

Built 1920 · 1,980 sq ft
Manage Home
LOT 4,959 SQ FT · 2 STRUCTURES · APN 045200-1130Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1920
Living area
1,980 sqft
Lot size
4,959 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
045200-1130
Last sold
$710,000
County value
$1,211,000

Major systems

Heating
Forced air (gas)
Stories
1

See something wrong above? Report an error

Nearby on this street

See all 148 homes on NW 65th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2022
    permit on fileElectrical — Wiring For Attached Accessory Dwelling Unit · APOLLO ELECTRICAL SERVICES LLC
  • 2021
    permit on fileRoom addition — Construct Detached Accessory Dwelling Unit (Dadu) Accessory To Single Family Residence Per Standard Plan 6794017-Sp
  • 2021
    permit on fileRoom addition — Construct Substantial Alterations And An Attached Accessory Dwelling Unit In A Single-Family Residence Per Plans.
  • 2021
    permit on fileElectrical — *Renewed 3/4/2022, Ec* Remove Knob And Tube Wiring And Replace With Modern. 12/22/2021 Add (1) 150A Feeder
  • 2021
    permit on fileElectrical — Ufer Inspection Only For Dadu Project.
  • 2021
    permit on fileElectrical — Wire Detached Adu. 10/13/2021 Add (3) 15-25A Circuits, (1) 30-50A Circuit. 11/4/2021 Add (1) 120A Feeder · APOLLO ELECTRICAL SERVICES LLC
  • 2020
    permit on fileElectrical — New 300 Amp 3 Pack Meter Socket For 3 Units (Primary Dwelling Unit, Adu And Detached Adu), New 200 Amp Panel And Breakers For Pdu Unit. Conduit Only Provisions For Adu Panels. 12/14/2020 Jnl Change Service From 300A To 400A. 11/15/2021 Add (1) 150A Feeder · APOLLO ELECTRICAL SERVICES LLC

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2022
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.