SeattleHomework Sign in
Seattle, WA 98126 · 30th Ave SW · Pleasant Grove Add To W S

7742 30th Ave SW

Built 1953 · 1,890 sq ft
Manage Home
LOT 6,050 SQ FT · 3 STRUCTURES · APN 681810-0235Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
1,890 sqft
Lot size
6,050 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2.5
Home type
Single-family
Parcel (APN)
681810-0235
Last sold
$905,000
County value
$858,000

Major systems

Heating
Electric baseboard (electric)
Stories
1

See something wrong above? Report an error

Nearby on this street

See all 311 homes on 30th Ave SW →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2020
    permit on fileElectrical — Jordan: Install 8X New Ir Radiant Ceiling Heater In Various Rooms Throughout Home, Reusing Existing Circuits And Thermostats. · WEST SEATTLE ELECTRIC & SOLAR
  • 2019
    permit on fileGeneral remodel — Construct Additions And Alterations To Existing Single Family Residence And Establish Parking Per Stfi
  • 2019
    permit on fileElectrical — Adding Lights, Switches And Plugs, In Addition · Sun Path Electric LLC
  • 2018
    permit on fileElectrical — 50Amp 240Volt Range Circuit, 200Amp Panel, 200Amp Service Upgrade · Seatown Electric, Plumbing, Heating & Air dba Seatown Services
  • 2009
    permit on fileBathrooms — Remodel Basement Of Single Family Dwelling For Enlarged Existing Bathroom And Furr Out Walls Subject To Field Inspection (Stfi).
  • 2009
    permit on fileElectrical — When I Purchased The House In 2005 The Basement Was Partially Finished With Electrical Throughout The Basement. My Intention Is To Finish The Basement Using The Existing Electrical But Running It A Little Different. 11/2/09 Jcb; Add (8) Lights, (4) Switches. 3/25/10 Mvc: Transfered From Owner To A&I · A&I ELECTRICAL REPAIR

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2020
KitchenUnknown
Not found in our records yet
BathroomsOn record
Permit on file · 2009

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.