SeattleHomework Sign in
Seattle, WA 98107 · NW 49th St · Dennys Add To Ballard & Seattle

633 NW 49th St

Built 1944 · 1,450 sq ft
Manage Home
LOT 4,680 SQ FT · 3 STRUCTURES · APN 198220-1300Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1944
Living area
1,450 sqft
Lot size
4,680 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
198220-1300
Last sold
$350,000
County value
$1,031,000

Major systems

Heating
Radiant (gas)
Stories
1.5

See something wrong above? Report an error

Nearby on this street

See all 67 homes on NW 49th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2020
    permit on fileElectrical — Addition To Existing Home. Relocation Of Existing Breaker Panel. Adding Outlets And Lighting To Addition Area As Well As A Subpanel For Hvac And Spa Equipment. Subpanel Is To Be Fed From Main Panel In The Garage, In The Same Manner That The House Is. Ufer Grounding Installed In New Footings For Addi
  • 2020
    permit on fileElectrical — We Have Added The Ufer Grounding To The New Footings For An Addition.
  • 2019
    permit on fileGeneral remodel — Construct Additions And Alterations To Existing Single Family Residence Per Stfi
  • 2015
    permit on fileElectrical — Low Voltage In Conjunction With Unit Heater Install · GLENDALE HEATING & A/C
  • 2014
    permit on fileGeneral remodel — Remove Existing And Construct New Detached Garage Accessory To Single Family Residence Per Plan. · LISA PORT
  • 2014
    permit on fileElectrical — Install 1 New 200 Amp Service & 1 New 100 Amp Feeder. 9/18/14 Jcb; Add Ufer Ground Testing. · ALL CITY ELECTRIC INCORPORATED
  • 2014
    permit on fileElectrical — [A One-Line Diagram Will Be Required On Site At The Time Of Inspection Of Any Renewable Energy System. A Cover Inspection Is Required Before Installation Begins, But After The Equipment Is On-Site. ] Wiring Of New Garage Lighting And Recepticals 9/25/15 Hkh; Renew

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2020
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.