SeattleHomework Sign in
Seattle, WA 98118 · Lake Shore Dr S · Uplands The

6263 Lake Shore Dr S

Built 2014 · 1,590 sq ft
Manage Home
LOT 8,025 SQ FT · 3 STRUCTURES · APN 883540-0585Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
2014
Living area
1,590 sqft
Lot size
8,025 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
1
Bathrooms
1.5
Home type
Single-family
Parcel (APN)
883540-0585
Last sold
$465,000
County value
$1,499,000

Major systems

Heating
Hot water (gas)
Stories
1

See something wrong above? Report an error

Nearby on this street

See all 27 homes on Lake Shore Dr S →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2025
    permit on fileSolar — Installing An 7.04 Kw Dc, 5.58 Kw Ac Output Pv System On Rooftop. · A&R SOLAR CORP
  • 2024
    permit on fileGeneral remodel — Construct Carport Addition To Existing One Family Dwelling Per Plan.
  • 2018
    permit on fileElectrical — Add (2) Circuits For Office Furniture
  • 2015
    permit on fileElectrical — Hook Up Shop Equipment · Active Engineering
  • 2015
    permit on fileElectrical — Add Branch Circuits For Shop Machinery · Active Engineering
  • 2014
    permit on fileElectrical — Structred Wiring, Muli-Media, Local Audio, Security System · INTEGRITY HOME INTEGRATION INC
  • 2013
    permit on fileElectrical — Temporary Permit - Now Expired - No Final Inspection [Ufer Ground. ] Install Ufer Ground & Conduit For 400Amp Feeder · Active Engineering
  • 2013
    permit on fileElectrical — Wire For New Construction Of A Single Family House. 7/8/14 Jcb; Renew. 8/14/14 Jcb; Add 600 Amp Service And (3) 200 Amp Feeders. · Active Engineering
  • 2012
    permit on fileElectrical — [Temporary Power. ] · Active Engineering
  • 2012
    permit on fileElectrical — [Temporary Power. ] Add 100Amp Subpanel & (2) 50Amp Balogna Cords (Circuits) To Temporary Power Pole. Hook Up Job Shack To Power. · Active Engineering

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2018
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.