SeattleHomework Sign in
Seattle, WA 98105 · Purdue Ave NE · Hawthorne Hills Add

4550 Purdue Ave NE

Built 1947 · 1,990 sq ft
Manage Home
LOT 6,905 SQ FT · 2 STRUCTURES · APN 317910-0785Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,990 sqft
Lot size
6,905 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2.25
Home type
Single-family
Parcel (APN)
317910-0785
Last sold
$900,000
County value
$1,376,000

Major systems

Heating
Heat pump (electric/solar)
Stories
1
Garage
Garage (250 sqft)

See something wrong above? Report an error

Nearby on this street

See all 57 homes on Purdue Ave NE →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2025
    permit on file, unconfirmedRoom addition — Construct Addition & Alterations To One-Family Dwelling Per Plan
  • 2025
    permit on fileElectrical — Underground Conduits · BRIGHT & RIGHT ELECT SRVS LLC DBA MOGOVOLT
  • 2024
    permit on file, unconfirmedElectrical — New Service And Partial Rewire. 4/17/2026 Renewal Requested Through Zendesk.
  • 2020
    permit on fileElectrical — Telecommunication Work · ADT LLC
  • 2017
    permit on fileGeneral remodel — Construct Exterior Alterations To Existing Single Family Residence Subject To Field Inspection (Stfi)
  • 2017
    permit on fileElectrical — (1) 240V/40A, (1) 115V/15A And Low Voltage Line For Stat · EVERGREEN REFRIGERATION LLC
  • 2017
    permit on fileElectrical — Replace Knob And Tube Wiring And Change Panel · THE ELECTRICIANS LLC
  • 2017
    permit on fileSolar — 10-24-17 Bz Waived Plan Review Under 2017 7.7Kva Threshold Based On Inverter Output [A One-Line Diagram Will Be Required On Site At The Time Of Inspection Of Any Renewable Energy System. A Cover Inspection Is Required Before Installation Begins, But After The Equipment Is On-Site. ] Installation Of · Puget Sound Solar
  • 2009
    permit on fileElectrical — Wiring For Remodeled Sfr; Bldg Permit 6200133. 2/6/09 Bew Added 200 Amp Panel · HUNTER ELECTRIC COMPANY
  • 2008
    permit on fileRoom addition — Construct Small Addition For Bathroom/Closet Addition To An Existing Single Family Residence Per Site Plan And Subject To Field Inspection

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2025
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.