SeattleHomework Sign in
Seattle, WA 98199

4315 W Semple St

Built 2014 · 12,980 sq ft
Manage Home
LOT 77,803 SQ FT · 3 STRUCTURES · APN 102503-9154Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
2014
Living area
12,980 sqft
Lot size
1.79 acres
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
5.25
Home type
Single-family
Parcel (APN)
102503-9154
County value
$12,665,000

Major systems

Heating
Heat pump (gas/solar)
Stories
2

See something wrong above? Report an error

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2026
    permit on fileGeneral remodel — Construct Bulkhead Repairs Per Plan.
  • 2023
    permit on fileElectrical — Install 240V 50A Circuit For Ev Charger · Active Engineering
  • 2019
    permit on fileElectrical — Meter Relocation · Ozz Electric WA Inc
  • 2018
    permit on fileSolar — Pv System On Roof. 09/27/18 Jk Approved One-Line Diagram. · Ozz Electric WA Inc
  • 2015
    permit on fileElectrical — Add (10) Landscape Lighting Circuits (Lighting Installed By Others) · Active Engineering
  • 2014
    permit on fileSolar — [A One-Line Diagram Will Be Required On Site At The Time Of Inspection Of Any Renewable Energy System. A Cover Inspection Is Required Before Installation Begins, But After The Equipment Is On-Site. ] 9.90Kwdc Rooftop Pv System · Ozz Electric WA Inc
  • 2013
    permit on fileElectrical — [Ufer Ground. ] Permit Pool Bonding, Did Not See An Option For Pool Bonding So Purchased Ufer. Need Inspection Wednesday 02.20.13 For Thurs Concrete Pour · Active Engineering
  • 2013
    permit on fileElectrical — Wire New House Complete. 2/10/15 Jcb; Changed 500 Amp Service To 600 Amps And Added (4) 150-200 Amp Feeders, (3) 60-125 Amp Feeders. 4/22/15 Jcb; Add Ufer Ground Testing. · Active Engineering
  • 2013
    permit on fileElectrical — Low Voltage New Construction. 5/28/14 Jcb; Renew. 5/27/15 Jle Renew. · CASCADE INTEGRATION INC
  • 2012
    permit on fileElectrical — Install Power To Jobsite Trailer · Active Engineering
  • 2011
    permit on fileElectrical — Temp Power For New Sfr; Bldg Permit 6271803 · Active Engineering

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2023
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.