SeattleHomework Sign in
Seattle, WA 98103 · Midvale Ave N · Lagrande Extension Add

3920 Midvale Ave N

Built 1906 · 1,990 sq ft
Manage Home
LOT 5,954 SQ FT · 2 STRUCTURES · APN 397540-0350Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1906
Living area
1,990 sqft
Lot size
5,954 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3.5
Home type
Single-family
Parcel (APN)
397540-0350
Last sold
$1,395,000
County value
$1,223,000

Major systems

Heating
Floor-wall (electric/solar)
Stories
1
Garage
Garage (310 sqft)

See something wrong above? Report an error

Nearby on this street

See all 60 homes on Midvale Ave N →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2015
    permit on fileGeneral remodel — Construct Deck Addition And Alterations To And Establish An Adu Within Basement Of Existing Single Family Dwelling Per Plans.
  • 2014
    permit on fileGeneral remodel — Finish Basement Of Single Family Residence And Alterations To Main Floor Subject To Field Inspection.
  • 2013
    permit on fileGeneral remodel — Construct Alterations To Create Unfinished Basement In Existing Single Family Residence Per Floor Plan And Subject To Field Inspection.
  • 2013
    permit on fileElectrical — Install 1 New 100 Amp Temporary Service (6378401) · ALL CITY ELECTRIC INCORPORATED
  • 2013
    permit on fileElectrical — Install 200 Amp Service, New Circuits & Outlets. 11/18/13 Jcb; Add 200 Amp Feeder. 9-15-14 Ah. Added (51) Luminaries, (37) Switches, (46) Receptacles, (4) Residential Fans, (4) Smoke Detectors, (5) 1Kw-Electric Heaters, (5) 1.5Kw-Electric Heater, (1) 100Amp-(120/240Volts) Feeder. 10/1/14 Jcb; Renew. · ALL CITY ELECTRIC INCORPORATED
  • 2013
    permit on fileSolar — [A One-Line Diagram Will Be Required On Site At The Time Of Inspection Of Any Renewable Energy System. A Cover Inspection Is Required Before Installation Begins, But After The Equipment Is On-Site. ] Solar Array 5.94 Kwdc · Northwest Electric & Solar

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2013
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.