SeattleHomework Sign in
Redmond, WA 98052 · NE 20th Pl · Tam O Shanter Park No. 06

18502 NE 20th Pl

Built 2025 · 4,170 sq ft
Manage Home
LOT 9,543 SQ FT · APN 856305-0480Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
2025
Living area
4,170 sqft
Lot size
9,543 sqft
Bedrooms
5
Bathrooms
4.25
Home type
Single-family
Parcel (APN)
856305-0480
Last sold
$3,700,000
County value
$3,936,000

Major systems

Heating
Forced air (gas)
Stories
2
Garage
Garage (740 sqft)

See something wrong above? Report an error

Nearby on this street

See all 26 homes on NE 20th Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2026
    permit on file, unconfirmedHeating & cooling — (3) Gas Piping - 2021 Imc - Underground Gas Line From Gas Meter To The Backyard For 2 Firepits And 1 Bbq.
  • 2025
    permit on filePlumbing — (1) Backflow Preventer & Vacuum Breaker- 2021 Upc
  • 2025
    permit on filePlumbing — Reconnect To Existing Side Sewer
  • 2025
    permit on fileGeneral remodel — Install 1" Water Meter - Rnew Infill - Home Project 511 - 2018 Irc - Construction Of A New 2 Story, Garage Right, Fire Sprinkled Single-Family Residence Including 4225 Sf Dwelling Area, 252 Sf Covered Deck/Porch, 225 Sf Uncovered Deck/Porch, 720 Sf Garage. Total Area Of Construction = 5422 Sf.
  • 2025
    permit on fileElectrical — (2) Circuits - 2023 Nec - Separate Hall Lights Into More Zones; Entry Area Lights Into 2 Zones, And Up Hall Area Into 3 Zones; Adding Switches As Needed
  • 2025
    permit on fileElectrical — Install Generator And Transfer Switch- (1) Generator- 2023 Nec
  • 2025
    permit on fileHeating & cooling — (1) Gas Piping - 2021 Imc - Gas Piping For Generator Install
  • 2024
    permit on fileHeating & cooling — Install Gas Fireplace. No Gas Piping. - (1) Fireplace- 2021 Imc
  • 2024
    permit on fileHeating & cooling — 2021 Imc - (1) Air Conditioner (1) Air Handler/Furnace (1) Compressor (1) Dryer Vent (7) Exhaust Fan (1) Fireplace (4) Gas Piping (1) Range Exhaust. Mechanical Full System Installation In New Construction Sfr, Including Venting, Gas Piping (4 Outlets: Furnace, Range, Fp, Bbq), And Cooling (4 Ton Com
  • 2024
    permit on fileWater heater — New Construction Plumbing Permit (3) Bathtubs (1) Clothes Washer (1) Dishwasher (1) Electric Water Heater (1) Garbage Disposal (2) Hose Bibs (2) Shower/Valve Replacements (8) Bathroom Sinks (1) Kitchen Sink (1) Utility Sink (5) Toilets (1) Water Service (1) Other 2021 Upc
  • 2024
    permit on fileSolar — Pv System On Roof. - (1) Feeder + (1) Circuit - 2023 Nec
  • 2024
    permit on fileElectrical — New 200 Amp Sfr; Ufer; Low Volt- (1) Ground Ufer, (1) Low Voltage, (1) Service New- 2023 Nec
  • 2024
    permit on fileElectrical — New 200 Amp Temp Pole (1) Temporary Service 2023 Nec

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACOn record
Permit on file · 2025
Water heaterOn record
Permit on file · 2024
ElectricalOn record
Permit on file · 2025
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.