- 2025
permit on fileElectrical — 100A Sub-Panel + Ev Charger - (1) Circuit + (1) Feeder - 2023 Nec
- 2023
permit on fileSolar — 6.4 Kw Pv Solar Panel Installation On Roof. (1) Circuit 2020 Nec
- 2021
permit on fileElectrical — Add 30 Amp Generator Plug With Interlock Kit. 2020 Nec - Customer Paid For 1 Generator.
- 2018
permit on fileHeating & cooling — Otc - Terrene At Redmond 8 - Lot 1 - Install Fireplace - Customer Paid For (1) Gas Logs Insert
- 2018
permit on fileHeating & cooling — Otc Terrene At Redmond 8 - Lot 1 Add Cooktop, Microwave Hood And Venting. Paid For 1 Ventilation System.
- 2017
permit on filePlumbing — Terrene At Redmond 8 - Lot 2 - Install (1) New Water Service For New Construction Single Family Residence.
- 2017
permit on fileHeating & cooling — Otc - Terrene At Redmond 8 - Lot 1 - Installing (2) Furnaces And (8) Vent Fans. Customer Paid For (2) Heating Equipment Including Ductwork, And (8) Vent Fans.
- 2017
permit on fileElectrical — Sopa #48912 - Terrene At Redmond 8 - Lot 1 - Zack 206-861-6355 - New Construction Stat Wire Customer Paid For:(1) Low Voltage
- 2017
permit on filePlumbing — Rnew Terrene At Redmond 8 - Lot 7 - Plan 4710A-B - Construction Of A New Two Story Garage Left Fire Sprinkled Single Family Home, With Basement. Construction Includes 5,144 Sf Of Dwelling Area, 538 Sf Of Garage, 74 Sf Of Covered Front Porch And A 205 Sf Uncovered Rear Deck. Total Area Of Work = 5,96
- 2017
permit on fileGeneral remodel — Rnew Terrene At Redmond 8 - Lot 7 - Plan 4710A-B - Construction Of A New Two Story Garage Left Fire Sprinkled Single Family Home, With Basement. Construction Includes 5,144 Sf Of Dwelling Area, 538 Sf Of Garage, 74 Sf Of Covered Front Porch And A 205 Sf Uncovered Rear Deck. Total Area Of Work = 5,96
- 2017
permit on filePlumbing — Terrene At Redmond 8 - Lot 1 -Install Sewer Ejector
- 2017
permit on fileElectrical — Otc Elec - Terrene At Redmond 8 - Lot 1 - Plan 4710A-B - Ufer.
- 2017
permit on fileElectrical — Sopa#47864 - Terrene At Redmond 8 - Lot 1 - 253-631-7750 - New 200 Amp Sfr To Include 100 Amp Temp Power Pole Customer Paid For:(1) Temporary Service, (1) Service - New
- 2017
permit on fileHeating & cooling — Otc Mech - Terrene At Redmond 8 - Lot 1 - Installation Of Gas Piping To Hwt, Range, Bbq, Fireplace, New Hvac, And Gas Water Heater For New Sfr. Customer Paid For (3) Gas Appliance And Piping, (1) Hwt, (1) Package Hvac Unit, & (1) Fireplace. A/C
- 2017
permit on filePlumbing — Otc Plum - Terrene At Redmond 8 - Lot 1 - New Water Service And 28 Total Plumbing Fixtures.
- 2017
permit on fileElectrical — Sopa - Terrene At Redmond 8 - Lot 1 - Front Of Lot, 425-889-1486 - Install 2 Spare Conduit For Future Use, Replace 1 Streetlight With New Led Streetlight Customer Paid For:(3) New Circuit
- 2016
permit on fileElectrical — Terrene At Redmond 8 - Lot 2 - Install Ground Conduit. Customer Paid For (1) Ground Ufer
- 2016
permit on fileElectrical — Terrene At Redmond 8 - Lot 2 - Install Temporary Power Pole For Construction. Customer Paid For (1) Temporary Service.
Manage this home to schedule a service or to update the timeline.