- 2021
permit on fileElectrical — Generator Interlock Kit With Pb30. 1 Circuit 2020 Nec
- 2021
permit on fileHeating & cooling — Add Nipel From Gas Meter Around Q2". 2018 Imc - 1 Gas Appliance.
- 2019
permit on fileElectrical — Sopa #58761 - Redmond 8 -- Lot 8 - 425-260-4982 - Relocate Wiring For Moved A/C Unit; Hook Up Unit In New Location Customer Paid For:(1) Circuits
- 2018
permit on fileElectrical — Sopa #54726 - Terrene At Redmond 8 - Lot 8 - 425-445-6157 - Hook Up A/C Customer Paid For:(1) New Circuit
- 2018
permit on fileHeating & cooling — Otc Terrene At Redmond 8-Lot 8 - Install And Plumb For Ac Unit. Paid For 1 Ac
- 2018
permit on filePlumbing — Terrene At Redmond 8 - Lot 8 - Repair Waste Water Pipe From Tub. Customer Paid For (1) Water Piping Repair/Replace
- 2018
permit on fileElectrical — Sopa #51795 Terrene At Redmond 8-Lot 8 - (206) 861-6355 -Low Voltage: 9 Tv Jacks; 3 Phone Jacks; 4 Data Jacks; 2 Hdmi Jacks (1 Cable) Customer Paid For:(1) Low Voltage
- 2018
permit on fileElectrical — Sopa #51658 - Terrene At Redmond 8-Lot 8 - Zach - 206-861-6355 - New Construction Stat Wire Customer Paid For:(1) Low Voltage
- 2017
permit on filePlumbing — Terrene At Redmond 8 - Lot 7 - Install Sewer Ejector
- 2017
permit on filePlumbing — Otc - Terrene At Redmond 8-Lot 8 - Plumbing New House, (22) Fixtures. Customer Paid For (4) Bathtubs, (1) Dishwasher, (1) Garbage Disposal, (2) Hose Bibs, (1) Irrigation System, (6) Bathroom Sinks, (1) Kitchen Sink, (1) Utility/Laundry Sink, (4) Toilets, (1) Water Service
- 2017
permit on filePlumbing — Rnew- Terrene At Redmond 8-Lot 8 - Plan 4011B, Construction Of New Garage Left, 2-Story Fire-Sprinklered Sfr, Consisting Of 4,126 Sf Of Dwelling, 536 Sf Of Garage, 47 Sf Covered Front Porch, And 178 Sf Of Uncovered Rear Concrete Patio (Not In Valuation). Total Area Of Work = 4,887 Sf [4,709 Sf In Va
- 2017
permit on fileHeating & cooling — Otc - Terrene At Redmond 8-Lot 8 - Gas Piping To Fireplace, Hwt, Range, & (2) Furnaces; (5) Vent Fans. Customer Paid For (5) Gas Appliance & Piping And (5) Vent Fans.
- 2017
permit on fileGeneral remodel — Rnew- Terrene At Redmond 8-Lot 8 - Plan 4011B, Construction Of New Garage Left, 2-Story Fire-Sprinklered Sfr, Consisting Of 4,126 Sf Of Dwelling, 536 Sf Of Garage, 47 Sf Covered Front Porch, And 178 Sf Of Uncovered Rear Concrete Patio (Not In Valuation). Total Area Of Work = 4,887 Sf [4,709 Sf In Va
- 2017
permit on fileElectrical — Online #50421- Terrene At Redmond 8 -- Lot 8 (206) 861-6355 Work Description: New 200 Amp Sfr To Include (1) New 100 Amp Temp Pole And Ufer Customer Paid For:(1) Temporary Service, (1) Service - New, (1) Ground Ufer - Per Inspector Visit
- 2017
permit on filePlumbing — Otc Plumb - Terrene At Redmond 8 -New Water Service And Plumbing Fixtures For New Sfr.
Manage this home to schedule a service or to update the timeline.